5 ton overhead crane is suitable for general manufacturing workshop, production line, loading and unloading materials. It can equipped with different lifting tools to help different loads to be lifted. So this single girder eot crane is more and more popular in kinds of workshops. After the 5ton single girder crane has installed, the crane in the internal workshop of the factory, it should perform performance tests such as no-load linkage and load trial run on the crane, and pass the inspection by the relevant inspection department before it can be put into production operations.
Preparation before the test of 5ton overhead crane:
1. ready to complete a random file.
2. according to the packing list inventory equipment, the number of documents is complete, check whether the material, type, specifications meet the quality requirements.
3. Installation of equipment, installation of electrical systems, and self-inspection. No problems found.
4. Add lubricating oil to all operating mechanism linkage parts.
5. Install the steel structure and check the connection conditions of the traffic beam, brake beam and pillars to ensure the fastening is reliable.
6. Prepare all the tools, materials, testing instruments, etc. used for trial operation in advance.
7. Clean the equipment, remove the debris on the track, and ensure there are no obstacles on the running route.
In addition, working environment temperature of this electric single girder crane is -25-40 °C. It is widely used for lifting goods on different occasions such as factory workshops, warehouses and stockyards. It is prohibited to use in flammable and explosive corrosive media environments. For special environmental operation, please contact us for custom design of non-standard electric single beam cranes.