5 ton electric hoist is mainly used for various lifting, relocation, loading and unloading of heavy objects, flipping and welding of oil tanks, such as installation and movement of large and medium-sized concrete, steel structures and mechanical equipment. It is applicable to construction and installation companies, civil engineering works and bridges of factories and mines, and bridges. Construction, power, shipbuilding, automobile manufacturing, construction, roads, bridges, metallurgy, mining, slope tunnels, wells and other infrastructure construction and protection of mechanical equipment.
From above all, we can have a conclusion that the electric hoist really has a wide application in our daily industrial life. And electric hoist is also the main component for one industrial crane such as overhead bridge crane, gantry hoist crane and jib crane, etc. During the working process, it maybe happen to have some malfucton. However, do you know how to deal with these breakdowns? So today nucleon crane's engineer will talk about the operation regulations of electric hoist.
1. The electric wire rope hoist should be operated by a professional. The operator should master the safe operation procedure of the wire rope electric hoist and must not tilt the cargo.
2. in the use of wire rope electric hoist should be equipped with professionals to regularly check the wire rope electric hoist, if there is a fault, timely treatment, but also have detailed records.
3. In the process of using the wire rope electric hoist, if the equipment fails, the main power should be cut off immediately.
4. the use of wire rope electric hoist should pay more attention to the use of wearing parts.
5. wire rope electric hoist after the end of work, we must put heavy objects, to prevent wire rope electric hoist parts deformation caused damage. Otherwise, the wire rope will be seriously damaged, affecting the life of the wire rope.